16th Street FreeRide
Route page →The free electric shuttle along 16th Street (the MallRide until 2025), running 1.25 miles between Union Station and Civic Center Station, every 4–5 minutes at peak. RTD's 2027 budget options would end it in 4 of 5 service-cut scenarios. This page sets out what it costs, who rides it, and how it compares with Las Vegas and with self-driving robotaxis.
As RTD states it
quoted figuresCost per ride is the two quoted figures divided; they come from the same article but RTD did not say they cover the same year. Fleet: 36 vehicles (2025-06).
This site's estimate, 2024
modelService hours × RTD's average bus cost per hour. That average is for full-size buses across the network; the FreeRide's small shuttles likely cost less per hour, so RTD's own figure is the better guide. 2024 was also a detour year with longer trips and fewer riders.
Riders by year
2018–2024: route boardings and service hours RTD reported (via Greater Denver Transit). 2025: RTD's figure as reported by Denverite; no service hours published, so no per-hour value. 16th Street was rebuilt from 2022 to 2025 and the shuttle ran detours on 15th and 17th Streets, so those years are not normal service.
Before and after the rebuild
From RTD's December 2025 release; see sources below.
Estimated cost by year (this site's model)
| Year | Boardings | Service hours | Boardings / hour | Est. cost | Cost / boarding |
|---|---|---|---|---|---|
| 2024 | 1,483,561 | 46,034 | 32.2 | $13.9M | $9.37 |
| 2023 | 1,096,850 | 32,947 | 33.3 | $8.7M | $7.91 |
| 2022 | 1,278,005 | 20,662 | 61.9 | $4.9M | $3.83 |
Check on the model: RTD's figure for the B Line is $48.40 per boarding (Denverite); this site estimates $48.78 for 2024.
What if robotaxis carried the FreeRide's riders?
Short trips are where robotaxis look cheapest. The catch is rush hour: one shuttle every few minutes carries what would take a stream of four-seat cars. Every input below is an assumption you can change.
Rush hour
Robotaxi cost = riders × ride length × (1 + empty miles) ÷ riders per car × cost per vehicle-mile. Assumptions: $1.25/vehicle-mile, 1.00-mile rides, 40% empty miles, 1.0 riders per car, $0.00 fare.
Not modelled: curb space for 630 pickups an hour on a street built for shuttles and pedestrians, wheelchair access, and whether an operator would run a fleet this size for rides this short. The robotaxi cost per mile is the operator's cost, which no company has published.
What a rider pays
The Las Vegas trips are longer than a FreeRide hop, so the fares are not per-mile comparable; they show what riders are being charged for a self-driving car today. One newspaper sample on one afternoon. Report a robotaxi fare you paid.
Denver and Las Vegas buses
Both agencies report to the National Transit Database on the same definitions. NTD has no route-level data, so the Strip's Deuce route cannot be separated from the rest of Las Vegas' bus network (Regional Transportation Commission of Southern Nevada, which contracts out all its bus service).
| Year | Agency | Bus boardings | Operating cost | Cost / boarding | Cost / vehicle-hour | Boardings / vehicle-hour | Avg fare paid | Fares cover |
|---|---|---|---|---|---|---|---|---|
| 2025 | RTD Denver | 44.0M | $572.1M | $13.00 | $242.84 | 18.7 | $0.78 | 6.0% |
| RTC Las Vegas | 55.8M | $251.5M | $4.51 | $164.09 | 36.4 | $1.06 | 23.6% | |
| 2024 | RTD Denver | 44.0M | $513.9M | $11.67 | $241.70 | 20.7 | $0.81 | 6.9% |
| RTC Las Vegas | 52.2M | $242.0M | $4.64 | $167.59 | 36.1 | $1.09 | 23.5% | |
| 2023 | RTD Denver | 42.4M | $419.8M | $9.89 | $202.66 | 20.5 | $0.77 | 7.8% |
| RTC Las Vegas | 49.6M | $198.6M | $4.01 | $138.04 | 34.5 | $1.12 | 27.9% | |
| 2022 | RTD Denver | 39.0M | $368.0M | $9.44 | $183.31 | 19.4 | $0.93 | 9.9% |
| RTC Las Vegas | 41.0M | $184.7M | $4.51 | $127.08 | 28.2 | $1.14 | 25.2% |
Motor bus, directly operated and contracted combined. Source: NTD agencies 80006 (RTD) and 90045 (RTC Southern Nevada). Las Vegas carries more riders per bus hour and its contracted service costs less per hour.
What self-driving services have published
Robotaxi companies publish ride counts and fleet sizes but not what a ride costs them to provide. A few public-agency shuttle pilots have published costs; almost all ran with a human attendant on board, so they do not show driverless labor savings. Only figures quoted from a source appear here; hover a source for the exact words.
| Service | Measure | Period | Value | Source | Notes |
|---|---|---|---|---|---|
| Access A Ride | Cost per trip | 2025 | $106.00 USD/trip | RTD Board Chair letter on Access-on-Demand | p.2. Door-to-door paratransit with RTD-contracted vans. |
| Access On Demand | Active users | 2025-08 | 3,398 users | RTD news release unchecked | |
| Access On Demand | Annual cost | 2026 onward | $15,000,000.00 USD/yr | RTD Board Chair letter on Access-on-Demand | p.3 |
| Access On Demand | Cost per trip | from 2026-01-01 | $20.00 USD/trip | RTD Board Chair letter on Access-on-Demand | p.2 table. Paratransit-eligible riders book taxis/ride-hail; RTD pays up to this per trip. |
| Access On Demand | Cost per trip wav | from 2026-01-01 | $270.00 USD/trip | RTD Board Chair letter on Access-on-Demand | p.2 table. Wheelchair-accessible vehicle trips. |
| Access On Demand | Wav monthly cost | 2025 | $1,000,000.00 USD/month | RTD news release unchecked | Wheelchair-accessible trips in Access-on-Demand. |
| Ada Minivan | Price | 2023 model year | $70,276.00 USD | Virginia DRPT price analysis unchecked | BraunAbility lowered-floor wheelchair-accessible Chrysler Voyager, state contract price. |
| Alpert 2013 | Nonemergent 911 share | 2005-09 | 0 share | Alpert et al., Health Affairs 2013 unchecked | Range 12.9-16.2%; estimated savings $283-560M a year nationally. |
| Ambulance Orgs | Nonemergency share forprofit | 2022-23 | 0 share | MedPAC June 2026 report, ch.6 unchecked | Table 6-5. |
| Ambulance Orgs | Nonemergency share government | 2022-23 | 0 share | MedPAC June 2026 report, ch.6 unchecked | Table 6-5, all payers. Denver Health is government-run, so most of its transports are 911 calls; scheduled non-emergency trips are mostly run by private companies. |
| Ark | Robotaxi price at scale | projection | $0.25 USD/mile | Investing.com (ARK Big Ideas 2025) unchecked | Projection. |
| RAPID, Arlington TX | Fare | 2025 | $3.00 USD per ride | City of Arlington unchecked | Free for students and staff. Published 2025-03. |
| RAPID, Arlington TX | Fleet vehicles | 2025 | 4 vehicles | City of Arlington unchecked | Published 2025-03. |
| RAPID, Arlington TX | Rides | 2021-03 to 2025-05-30 | 113,108 rides | Arlington FY2026 budget (p. 319) unchecked | Arlington TX on-demand AV service (May Mobility, Via); ended May 30 2025. |
| Aurora Fire | Low acuity share | 2023-10 | 25 percent | Aurora Fire Rescue news unchecked | Aurora now refers some low-acuity calls to a nurse line. |
| Baidu Apollo Go (robotaxi, China) | Driverless rides | 2025-Q4 | 3,400,000 rides per quarter | Baidu Q4 2025 results unchecked | Mainland China. Published 2026. |
| Bus Automation | Retrofit cdot | FY22 award | $2,169,012.00 USD | FTA ADAS fact sheet (CDOT) unchecked | CDOT Bustang: driver-assistance (Level 1-2) on 3 vehicles. A driver stays aboard. |
| Bus Automation | Retrofit panynj | 2019-23 | $2,087,500.00 USD | FTA Report 0258 unchecked | 3 MCI coaches retrofitted to Level 3 automated braking and steering (Lincoln Tunnel bus lane). Whole project cost, not a per-bus price. |
| Cde | Grades 9 12 share | 2025-26 | 0 share | CDE SchoolView enrollment unchecked | Grades 9-12 = 277,580 of 870,793 statewide (31.9%); Denver Public Schools 29.8%. |
| Colorado Constitution | Article xi | current | 2 section | Colorado Constitution, Article XI unchecked | Sections 1-2 restrict public bodies lending credit to, donating to, or co-owning with private parties. Courts recognise a public-purpose exception for grants; whether it covers an RTD loan or lottery needs a lawyer. |
| Colorado Demography | Age 65 plus | 2024 | 983,514 people | Colorado State Demography Office, 2024 Population Summary | PDF p.8 Table 1. Statewide. |
| Colorado Demography | Age 65 plus growth | 2020-2030 | 0 share | Colorado State Demography Office, 2024 Population Summary | PDF p.14. |
| Colorado Nemt | Cost per trip | 2023 | $128.52 USD/trip | Washington HCA NEMT legislative report (Colorado comparison) unchecked | p.27 Fig. 10. Colorado Medicaid non-emergency medical transport: 961K trips, $126M. |
| Colorado Nemt | Trips | 2023 | 961,000 trips | Washington HCA NEMT legislative report (Colorado comparison) unchecked | p.27 Fig. 10. |
| County Connection AV pilot, Martinez CA | Cost per passenger | FY2025 | $706.10 USD per passenger | County Connection board report (p. 2-4) unchecked | Operator labor only; a very low-demand service. Published 2025-09. |
| County Connection AV pilot, Martinez CA | Passengers per hour | FY2025 | 0 passengers per hour | County Connection board report (p. 2-4) unchecked | Published 2025-09. |
| County Connection AV pilot, Martinez CA | Riders | 2024-09-16 to 2025-06-30 | 311 riders | County Connection board report (p. 2-4) unchecked | Martinez CA pilot (May Mobility), union operators on board. Published 2025-09. |
| Denver Health Ems | Star responses | 2025 | 11,059 responses | Denver Health Paramedic Division, By the Numbers 2025 | p.3. STAR: behavioural-health responders sent instead of police or ambulance. |
| Denver Health Ems | Transports | 2025 | 80,681 transports | Denver Health Paramedic Division, By the Numbers 2025 | p.1 chart, 2022-2025 transports; 131,877 responses in 2025. |
| Dps | High school rtd pass | 2019 | 2 miles | Chalkbeat unchecked | High-schoolers living more than 2.5 miles away got RTD passes; since 2023 riders 19 and under ride RTD free. |
| Egrid | Co2e rmpa | eGRID2023 | 1,042 lb/MWh | EPA eGRID2023 summary tables unchecked | Table 1 p.2, total output CO2e rate, Rockies grid subregion. |
| Eiheiji Level 4 service, Japan | Riders | 2023-05 to 2024-04 | 1,348 people | Arab News Japan unchecked | Japan's first Level 4 service, 7 seats, 12 km/h; fare 100 yen; operator says fares do not cover costs. Published 2024. |
| Epa | Co2 per gallon diesel | 2025 hub | 10 kg/gal | EPA GHG Emission Factors Hub 2025 unchecked | Table 2, mobile combustion CO2, tank-to-wheel. |
| Epa | Co2 per gallon gasoline | 2025 hub | 9 kg/gal | EPA GHG Emission Factors Hub 2025 unchecked | Table 2. |
| Fta | Real property disposition | current | 1 rule | FTA, Disposition of Real Property guidance unchecked | Options include returning FTA's share, applying proceeds to replacement property or, with FTA approval, to other capital projects. Quote from a transit agency summary of FTA Circular 5010.1; check the current circular (5010.1F). |
| goMARTI, Grand Rapids MN | Fleet vehicles | 2022-2024 | 5 vehicles | University of Minnesota CTS summary (p. 1-3) unchecked | |
| goMARTI, Grand Rapids MN | Riders | 2022-10 to 2024-05 | 10,000 riders | University of Minnesota CTS summary (p. 1-3) unchecked | Grand Rapids MN (May Mobility), human operator on board, free. |
| Hopskipdrive Dps | Base fare | 2024 | $19.00 USD | Next City unchecked | Vetted-driver ride service for students; DPS used it for about 250 students a day. |
| Hopskipdrive Dps | Per mile | 2024 | $2.99 USD/mile | Next City unchecked | |
| Innisfil Uber | Subsidy per passenger | first 8 months to 2018-03 | 6 CAD | Global News unchecked | Against a forecast $33 per passenger for a bus route. |
| Jaguar Ipace | Energy use | 2019 EPA | 0 kWh/mile | fueleconomy.gov unchecked | kWh per 100 miles; Waymo's main vehicle. |
| Joby | Target price per seat mile | 2021 investor deck | $3.00 USD/seat-mile | Gizmodo unchecked | Passenger service now targeted for 2027. |
| JTA NAVI, Jacksonville (downtown AV shuttle) | Annual operating cost estimate | pre-launch estimate | $8,000,000.00 USD per year | Jacksonville Daily Record unchecked | Estimate before launch, not an actual cost. Phase 1 capital $66.4M per the same article. |
| JTA NAVI, Jacksonville (downtown AV shuttle) | Daily riders | first 3 months | 100 riders per day | Jax Today unchecked | Fare $1.75 from Oct 1 2025; free before. |
| JTA NAVI, Jacksonville (downtown AV shuttle) | Riders | first year from 2025-06-30 | 15,200 passengers | Sustainable Bus unchecked | Jacksonville downtown AV shuttle (Beep, Ford E-Transit vans, 3.5-mile corridor). Human attendant on board. |
| JTA NAVI, Jacksonville (downtown AV shuttle) | Seats | 2025 | 9 passengers | Jacksonville Daily Record unchecked | |
| Downtown Las Vegas AV shuttle pilot (2017) | Seats | 2017 | 15 passengers | NTSB report HAB1906 unchecked | Downtown Las Vegas pilot (Keolis/Navya), free, attendant on board. Ridership and cost not published. Published 2019. |
| May Mobility | Wav launch | 2022-09 | 3 vehicles | May Mobility unchecked | goMARTI, Grand Rapids MN: automated wheelchair-accessible minivans in public service. |
| Medicare Ambulance | Bls nonemergency base | 2026 | $284.56 USD | MedPAC Payment Basics: Ambulance 2026 | p.3 Table 1. National base before geographic adjustment; Medicare pays less than private charges. |
| Medicare Ambulance | Dialysis share | 2011 | 0 share | MedPAC June 2013 report, ch.7 unchecked | p.180. 97% of dialysis transports were BLS non-emergency. |
| Medicare Ambulance | Mileage rate | 2026 | $9.15 USD/mile | MedPAC Payment Basics: Ambulance 2026 | p.3 |
| Medicare Ambulance | Nonemergency share | 2011 | 0 share | MedPAC June 2013 report, ch.7 unchecked | Table 7-6: share of Medicare fee-for-service ground ambulance claims that were non-emergency (BLS 42.0% + ALS 2.5%). Latest national split found. |
| Nhtsa | School bus safety | 2018 | 70 times | NHTSA School Bus Safety (archived) unchecked | |
| Obi Sf | Avg fare uber | Nov 2025-Jan 2026 | $17.47 USD | TechCrunch (Obi study) unchecked | San Francisco. |
| Obi Sf | Avg fare waymo | Nov 2025-Jan 2026 | $19.69 USD | TechCrunch (Obi study) unchecked | San Francisco. |
| Pony.ai (robotaxi, China) | Fleet vehicles | 2026-Q2 | 1,975 vehicles | Pony.ai Q2 2026 results (SEC exhibit 99.1) unchecked | Published 2026. |
| Pony.ai (robotaxi, China) | Robotaxi revenue | 2026-Q2 | $12,100,000.00 USD per quarter | Pony.ai Q2 2026 results (SEC exhibit 99.1) unchecked | Published 2026. |
| Psta Direct Connect | Subsidy per ride | from 2017-02 | $5.00 USD | PSTA unchecked | Pinellas County, FL. |
| Rtd Benefit | Trips not made without transit | EBP onboard study | 21 percent | RTD FY2027 Budget Book (draft) | PDF p.59. |
| Rtd Budget | Capital needs | 2027-2031 | $1,800,000,000.00 USD | RTD FY2027 Budget Book (draft) | PDF p.6, GM message; plus $0.7B of 'known unknowns'. |
| Rtd Budget | Capital replacement reserve | 2026 amended | $166,000,000.00 USD | RTD FY2027 Budget Book (draft) | PDF p.49. |
| Rtd Budget | Capital replacement reserve | 2027 proposed | $50,237,000.00 USD | RTD FY2027 Budget Book (draft) | PDF p.49. Forecast to reach zero by 2030 (p.73). |
| Rtd Budget | Change in net position | 2025 actual | -$244,368,000.00 USD | RTD FY2027 Budget Book (draft) | PDF p.49, consolidated table ($ thousands). Draft budget; board vote December 2026. |
| Rtd Budget | Change in net position | 2026 amended budget | -$242,051,000.00 USD | RTD FY2027 Budget Book (draft) | PDF p.49. |
| Rtd Budget | Change in net position | 2027 proposed | -$231,310,000.00 USD | RTD FY2027 Budget Book (draft) | PDF p.2 and p.49. |
| Rtd Budget | Fares forecast | 2027 | $61,011,000.00 USD | RTD FY2027 Budget Book (draft) | PDF p.73. |
| Rtd Budget | Forecast change in net position | 2028 | -$37,124,000.00 USD | RTD FY2027 Budget Book (draft) | PDF p.73 Five-Year Financial Forecast, 2027-2031. |
| Rtd Budget | Forecast change in net position | 2029 | -$23,570,000.00 USD | RTD FY2027 Budget Book (draft) | PDF p.73. |
| Rtd Budget | Forecast change in net position | 2030 | -$63,856,000.00 USD | RTD FY2027 Budget Book (draft) | PDF p.73. |
| Rtd Budget | Projected deficit no action | 2030 | $900,000,000.00 USD | Denver Gazette unchecked | |
| Rtd Budget | Sales use tax | 2027 proposed | $939,812,000.00 USD | RTD FY2027 Budget Book (draft) | PDF p.49. |
| Rtd Budget | Service cut 2027 | 2027 | $20,000,000.00 USD | Denver Gazette unchecked | Board vote 9-6. |
| Rtd Budget | Unrestricted reserve forecast | 2030 | -$48,615,000.00 USD | RTD FY2027 Budget Book (draft) | PDF p.73. RTD's own forecast shows the unrestricted reserve below zero in 2030, a year that also needs $256M of new financing. |
| Rtd Fleet | Buses | 2025-10 | 955 buses | RTD news release unchecked | |
| Rtd Fleet | Diesel bus replacement | 2026-2030 | $539,000,000.00 USD | RTD news release unchecked | |
| Rtd Police | Department budget | FY2024 | $39,892,489.00 USD | RTD Approved FY2025 Budget | Transit Police and Emergency Management: sworn police, contracted security, emergency management. PDF p.74. |
| Rtd Police | Department budget | FY2025 | $62,650,795.00 USD | RTD FY2026 Budget Book | As restated in the FY2026 book (approved FY2025 was $57.3M). PDF p.75. |
| Rtd Police | Department budget | FY2026 | $53,140,561.00 USD | RTD FY2027 Budget Book (draft) | PDF p.82. Includes $24.8M of 'Services', mostly contracted security. |
| Rtd Police | Department budget | FY2027 proposed | $48,374,628.00 USD | RTD FY2027 Budget Book (draft) | PDF p.82. |
| Rtd Police | Department positions | FY2026 | 233 positions | RTD FY2027 Budget Book (draft) | PDF p.82. |
| Rtd Police | Security contract | May 2026 award | $44,750,170.40 USD | RTD purchasing report, May 2026 unchecked | Universal Protection Service (Allied). Multi-year total. |
| Rtd Police | Sworn officers | 2022-08 | 19 officers | RTD news release unchecked | 19 in August 2022, 56 in March 2024; goal of 119 by end of 2024. |
| Rtd Police | Sworn officers | 2024-05 | 67 officers | RTD news release unchecked | |
| Rtd Police | Sworn officers | 2025-12 | 105 officers | RTD news release unchecked | |
| Rtd Security | Boulder station meth | 2023-01 to 2024-02 | 1 closure | RTD news release unchecked | Downtown Boulder Station. |
| Rtd Security | Drug reports | 2025 | 803 reports | RTD security-related metrics | Sum of monthly figures. |
| Rtd Security | Drug reports | 2026 Jan-Sep | 284 reports | RTD security-related metrics | Sum of monthly figures; down 50-70% on the same months of 2025. |
| Rtd Security | Operators drug exposure leave | 2023 Apr-Aug | 192 operators | Denver7 unchecked | |
| Rtd Staff | Budgeted positions | FY2025 | 3,639 positions | RTD Approved FY2025 Budget | Represented 2,337; non-represented 1,302. |
| Rtd Staff | Budgeted positions | FY2027 proposed | 3,452 positions | RTD FY2027 Budget Book (draft) | PDF p.27. Represented 2,370; non-represented 1,082. |
| Rtd Staff | Bus operators budgeted | 2026-04 | 900 operators | RTD Bus Operations report, April 2026 unchecked | 885 filled. |
| Rtd Staff | Non represented positions | FY2025 | 1,302 positions | RTD Approved FY2025 Budget | Non-represented = salaried staff and management. |
| Rtd Staff | Non represented positions | FY2027 proposed | 1,082 positions | RTD FY2027 Budget Book (draft) | PDF p.27. |
| Rtd Survey | Feel safe bus | 2026 | 73 percent | RTD news release unchecked | Bus 73%, train 71%. |
| Rtd Survey | Feel safe train | 2026 | 71 percent | RTD news release unchecked | |
| Rtd Youth | Zero fare state funding | 2024 | $5,000,000.00 USD | RTD news release unchecked | Zero Fare for Youth: 19 and under ride free; state funds up to $5M. |
| School 0020 | Pupils | 2024-25 | 9,695 pupils | CDE transportation worksheet, Adams 12 Five Star | Adams 12 Five Star. The worksheet does not define the count; read as pupils transported. |
| School 0020 | Regular miles | 2024-25 | 1,227,196 miles | CDE transportation worksheet, Adams 12 Five Star | Adams 12 Five Star. Count-day mileage x school days. |
| School 0020 | School days | 2024-25 | 164 days | CDE transportation worksheet, Adams 12 Five Star | Adams 12 Five Star |
| School 0020 | Transport cost | 2024-25 | $12,495,911.21 USD | CDE transportation worksheet, Adams 12 Five Star | Adams 12 Five Star |
| School 0130 | Pupils | 2024-25 | 20,836 pupils | CDE transportation worksheet, Cherry Creek | Cherry Creek. The worksheet does not define the count; read as pupils transported. |
| School 0130 | Regular miles | 2024-25 | 1,255,790 miles | CDE transportation worksheet, Cherry Creek | Cherry Creek. Count-day mileage x school days. |
| School 0130 | School days | 2024-25 | 171 days | CDE transportation worksheet, Cherry Creek | Cherry Creek |
| School 0130 | Transport cost | 2024-25 | $34,053,900.78 USD | CDE transportation worksheet, Cherry Creek | Cherry Creek |
| School 0140 | Pupils | 2024-25 | 4,913 pupils | CDE transportation worksheet, Littleton Public Schools | Littleton Public Schools. The worksheet does not define the count; read as pupils transported. |
| School 0140 | Regular miles | 2024-25 | 622,450 miles | CDE transportation worksheet, Littleton Public Schools | Littleton Public Schools. Count-day mileage x school days. |
| School 0140 | School days | 2024-25 | 174 days | CDE transportation worksheet, Littleton Public Schools | Littleton Public Schools |
| School 0140 | Transport cost | 2024-25 | $8,707,471.76 USD | CDE transportation worksheet, Littleton Public Schools | Littleton Public Schools |
| School 0180 | Pupils | 2024-25 | 8,776 pupils | CDE transportation worksheet, Aurora Public Schools | Aurora Public Schools. The worksheet does not define the count; read as pupils transported. |
| School 0180 | Regular miles | 2024-25 | 824,040 miles | CDE transportation worksheet, Aurora Public Schools | Aurora Public Schools. Count-day mileage x school days. |
| School 0180 | School days | 2024-25 | 168 days | CDE transportation worksheet, Aurora Public Schools | Aurora Public Schools |
| School 0180 | Transport cost | 2024-25 | $22,327,082.87 USD | CDE transportation worksheet, Aurora Public Schools | Aurora Public Schools |
| School 0470 | Pupils | 2024-25 | 5,138 pupils | CDE transportation worksheet, St. Vrain Valley | St. Vrain Valley. The worksheet does not define the count; read as pupils transported. |
| School 0470 | Regular miles | 2024-25 | 2,105,870 miles | CDE transportation worksheet, St. Vrain Valley | St. Vrain Valley. Count-day mileage x school days. |
| School 0470 | School days | 2024-25 | 174 days | CDE transportation worksheet, St. Vrain Valley | St. Vrain Valley |
| School 0470 | Transport cost | 2024-25 | $14,657,943.03 USD | CDE transportation worksheet, St. Vrain Valley | St. Vrain Valley |
| School 0480 | Pupils | 2024-25 | 6,532 pupils | CDE transportation worksheet, Boulder Valley | Boulder Valley. The worksheet does not define the count; read as pupils transported. |
| School 0480 | Regular miles | 2024-25 | 1,602,578 miles | CDE transportation worksheet, Boulder Valley | Boulder Valley. Count-day mileage x school days. |
| School 0480 | School days | 2024-25 | 171 days | CDE transportation worksheet, Boulder Valley | Boulder Valley |
| School 0480 | Transport cost | 2024-25 | $17,924,528.35 USD | CDE transportation worksheet, Boulder Valley | Boulder Valley |
| School 0880 | Pupils | 2024-25 | 27,539 pupils | CDE transportation worksheet, Denver Public Schools | Denver Public Schools. The worksheet does not define the count; read as pupils transported. |
| School 0880 | Regular miles | 2024-25 | 2,000,078 miles | CDE transportation worksheet, Denver Public Schools | Denver Public Schools. Count-day mileage x school days. |
| School 0880 | School days | 2024-25 | 174 days | CDE transportation worksheet, Denver Public Schools | Denver Public Schools |
| School 0880 | Transport cost | 2024-25 | $41,343,141.26 USD | CDE transportation worksheet, Denver Public Schools | Denver Public Schools |
| School 0900 | Pupils | 2024-25 | 19,201 pupils | CDE transportation worksheet, Douglas County | Douglas County. The worksheet does not define the count; read as pupils transported. |
| School 0900 | Regular miles | 2024-25 | 1,930,697 miles | CDE transportation worksheet, Douglas County | Douglas County. Count-day mileage x school days. |
| School 0900 | School days | 2024-25 | 173 days | CDE transportation worksheet, Douglas County | Douglas County |
| School 0900 | Transport cost | 2024-25 | $30,590,705.40 USD | CDE transportation worksheet, Douglas County | Douglas County |
| School 1420 | Pupils | 2024-25 | 23,396 pupils | CDE transportation worksheet, Jeffco Public Schools | Jeffco Public Schools. The worksheet does not define the count; read as pupils transported. |
| School 1420 | Regular miles | 2024-25 | 3,616,431 miles | CDE transportation worksheet, Jeffco Public Schools | Jeffco Public Schools. Count-day mileage x school days. |
| School 1420 | School days | 2024-25 | 169 days | CDE transportation worksheet, Jeffco Public Schools | Jeffco Public Schools |
| School 1420 | Transport cost | 2024-25 | $33,213,037.09 USD | CDE transportation worksheet, Jeffco Public Schools | Jeffco Public Schools |
| Tesla Cybercab | Energy use | 2026-05 | 0 kWh/mile | New Mobility unchecked | |
| Tesla Cybercab | Personal use only | 2026-11 | 1 term | Electrek unchecked | Commercial use only with Tesla's written authorization. |
| Tesla Cybercab | Price | 2026-11 | $29,990.00 USD | Kelley Blue Book unchecked | Deliveries from December 2026. |
| Tesla Cybercab | Subscription | 2026-11 | $299.00 USD/month | Kelley Blue Book unchecked | |
| Tesla Owner Program | Launch guidance | Q3 2026 call | 2,027 year | Not a Tesla App unchecked | Revenue share not disclosed. |
| Tesla Owner Program | Musk owner earnings claim | 2019-04-22 | $30,000.00 USD/year | Teslarati unchecked | 2019 claim, not delivered. |
| Tesla Robotaxi | Cities | 2026-11 | 7 cities | TechCrunch unchecked | Austin fleet over 400 registered vehicles. |
| Tesla Robotaxi | Fare base | Austin from 2026-03-12 | $3.00 USD | The Driven unchecked | |
| Tesla Robotaxi | Fare per mile | Austin from 2026-03-12 | $1.40 USD/mile | The Driven unchecked | |
| Tesla Robotaxi | Target operating cost | Q3 2026 | $0.30 USD/mile | Not a Tesla App (Q3 2026 call recap) unchecked | A target, not a measured cost. |
| Treasure Island AV shuttle, San Francisco | Contract ceiling | 2022 award | $825,000.00 USD | SFCTA board memo (p. 1) unchecked | Contract ceiling, not actual spend. |
| Treasure Island AV shuttle, San Francisco | Riders | 2023-08 to 2023-12 | 1,100 riders | SFCTA unchecked | San Francisco, Beep shuttle, free, attendant on board; ended early for construction. |
| Uber | Minimum age | current | 18 years | Uber community guidelines unchecked | Teen accounts (13-17) only in some cities. |
| Waymo (robotaxi) | Avg fare bay area | 2026-01 | $19.69 USD per trip | TechCrunch (Obi data) unchecked | From simulated ride requests by Obi. |
| Waymo (robotaxi) | Deadhead share | Aug 2023-Dec 2025 | 0 share | Abdelhalim, Findings (CPUC data) unchecked | Empty share of all miles = 1 - 0.536. |
| Waymo (robotaxi) | Fleet | 2026-10 | 4,000 vehicles | Semafor unchecked | Plans 8,000 by end-2026 and 20,000 by end-2027. |
| Waymo (robotaxi) | Fleet target | end 2027 | 20,000 vehicles | Semafor unchecked | |
| Waymo (robotaxi) | Paid rides per week | 2026-09 | 500,000 rides per week | TechCrunch unchecked | Fleet about 4000 per TechCrunch estimate (not Waymo). |
| Waymo (robotaxi) | Teen accounts | 2025-07 | 13 min age | Waymo blog unchecked | Phoenix only at launch. |
| Waymo (robotaxi) | Transit rewards credit | 2026-09 | $2.85 USD | Waymo blog unchecked | Waymo credits a bus fare for trips linking to transit (Bay Area). |
| Waymo (robotaxi) | Wav human driven | 2026 | 1 policy | Waymo help centre unchecked | Wheelchair-accessible rides are human-driven and not offered in Denver. |
| Waymo (robotaxi) | Winter pause | 2026-11 | 1 policy | Waymo blog unchecked | May pause service in severe snow. |
| Waymo Denver | Announced test fleet | 2025-09 | 12 vehicles | KUNC unchecked | |
| Waymo Denver | Public launch | 2026-09-01 | 14 cities | Waymo blog unchecked | Invite-only at launch; announced Sept 2025 with 12 test cars. |
| Waymo Denver | Service area | 2026-09 | 60 sq mi | KUNC unchecked | The RTD district is about 2,340 sq mi. |
| Zoox (Amazon), Las Vegas | Authorized vehicles | 2026-08 | 100 vehicles | Las Vegas Review-Journal | |
| Zoox (Amazon), Las Vegas | Avg fare | 2026-08-10 | $22.62 USD per trip | Las Vegas Review-Journal | Six trips from the Excalibur (Bellagio, Fashion Show Mall, LVCC, Mandalay Bay, Top Golf, Sphere), app prices around 12:45 pm on launch day. One sample, includes a destination fee on the Sphere trip. |
| Zoox (Amazon), Las Vegas | Fleet in service | 2026-08 | 65 vehicles | Las Vegas Review-Journal | As stated by Zoox CEO on Fox Business. |
| Zoox (Amazon), Las Vegas | Pickup locations | 2026-08 | 15 locations | Las Vegas Review-Journal | Mainly the resort corridor. |
| Zoox (Amazon), Las Vegas | Riders all cities | to 2026-03 | 350,000 riders | TechCrunch unchecked | All Zoox cities combined. |
| Zoox (Amazon), Las Vegas | Seats | 2026 | 4 seats | Las Vegas Review-Journal |
Not published: Zoox and Waymo operating cost per mile or per ride, official fleet counts and revenue; JTA NAVI's actual operating cost and contract value; the 2017 Las Vegas pilot's riders and cost. Pilot costs are not comparable with each other: some are contract ceilings, some pre-launch estimates, one counts operator labor only. See the notes column.
Sources for the figures on this page
Route boardings and hours: Greater Denver Transit CSVs. Model cost: methodology. Las Vegas: NTD agency 90045. All hand-entered figures are in exports and on sources.